← Back to Risemeup

Virgin Mary Farm · For development partners

Rebuilding starts
with water.

Help restore water at Virgin Mary Farm so women and families can begin growing, learning and earning again.

Virgin Mary Farm in Omdurman is Risemeup’s main development project. It was destroyed during the war and is not operational. We are seeking water, irrigation and agricultural specialists to help assess the site and design a first growing and training area.

Website updated 27 October 2026 · Well and pump status updated 27 October
Planning and assessment stage; equipment delivery is not yet ready.
Download: partner brief · 27 October 2026 · Version 11

A first stage to develop together

Restore water.
Start growing. Share skills.

Our immediate aim is a viable water supply and an initial growing and training area. This proposed scope needs technical assessment, agreed responsibilities and funding.

See the illustrated water and reservoir plan →

Proposed scope

Inspect the seven wells reported intact and specify replacements for the broken pumps. Design daytime solar pumping, a reservoir or suitable tank storage, filtration and controlled irrigation for an assessed growing and training area. Assess battery storage for agreed electrical loads outside daylight hours. Agree crops, participation and training with the communities.

  1. Confirm the foundations

    Agree land-use terms and local responsibilities, confirm safe access and assess the wells, water availability and quality.

    Evidence to proceed: dated assessment, well records and agreed responsibilities.

  2. Design and cost the first system

    Define the growing area and water system, obtain comparable quotations, and agree training, participation and equipment custody.

    Evidence to proceed: technical design, itemised budget, operating plan and funding agreement.

  3. Install, test and hand over

    Once funding, access and secure storage are confirmed, procure compatible equipment, install the system, test its performance and train the named operators.

    Evidence to proceed: commissioning results, asset register, operator handover and maintenance schedule.

  4. Grow, teach and review

    Begin a supervised growing cycle and sustainable farming education. Record water use, crop performance, participation and costs, then decide with communities and partners whether to expand.

    Evidence for expansion: first-cycle review and an updated, costed plan.

Timing depends on safe access, assessment findings, written agreements, available funding and procurement. Delivery dates will be agreed after these dependencies are resolved.

The full Virgin Mary Farm vision

A long-term ambition.
A practical first step.

The wider vision includes ten greenhouses, biogas, poultry, produce handling and farming education. The Mango Project is a supporting subproject.

The 2018 proposal describes four facility components: what we hope to build. The five-phase recovery roadmap describes how production and facilities could develop gradually. Neither is a current budget or an agreed delivery schedule.

The roadmap explores the 130-hectare site and an ambition to reach 300+ families. Areas and participation are indicative. Any available surplus could support expansion, alongside further partner funding.

Explore the five-phase recovery roadmap →

Women and girls at the heart of the project

A place to regain strength.
A future shaped by possibility.

We plan farming education and livelihood opportunities for women from the Coptic Orthodox, Nuba Mountains and Blue Nile communities affected by war, including survivors of sexual violence, widows and mothers raising children alone.

Dignity and independence

Women would gain practical skills, opportunities to earn an income and a voice in the farm’s development. The programme will be shaped with communities and partners as rebuilding progresses.

Opportunity for girls

For girls and young women, we plan education and skills opportunities that build confidence and widen future choices. Girls’ learning will be age-appropriate, supervised and designed to support their safety and continued schooling.

Developing this responsibly

Participation must be voluntary and must not require disclosure of violence or trauma. Consultation should address caring responsibilities, travel and accessibility. We welcome women’s organisations and qualified psychosocial partners to help develop support and referral arrangements. These services are not yet established; farming does not replace specialist care.

Discuss a partnership for women’s livelihoods →
Training for everyone who works at the farm

Everyone working at the farm would receive training suited to their role, including sustainable farming, water management, safe equipment use and maintenance. Induction and continued learning would support each stage.

Dr. Eng. Khalid Salih brings university teaching experience from Berlin and expertise in renewable energy and workforce development. Our training plan will draw on his experience and the practical learning approach of the DIESALIHS Grand Renaissance Academy, alongside agricultural specialists and equipment suppliers. Course content, instructors and delivery arrangements will be developed as the farm is rebuilt.

Virgin Mary Farm · Where we stand

The next steps
towards rebuilding.

The summary below records the current position. Expand the details for land, management, access and water information supplied by the founder, alongside matters awaiting confirmation.

Not operationalLatest founder update, 27 October 2026: the seven wells are reported intact, but all pumps are broken and need replacing. Pumping is not operational; well inspection, yield and water-quality tests, and new storage design are needed.
Read land, management and technical readiness details
Who owns the land?
Founder-reported · 130 hectares

Iman Tadros confirms that the farm covers 130 hectares (approximately 321 acres) and identifies the landowner as the Coptic Orthodox Church in Sudan, Khartoum–Omdurman. Ownership documents, surveyed boundaries and the authorised Church signatory remain subject to partner due diligence. Cultivable areas and infrastructure allocations will follow site assessment.

Risemeup’s right to use it
Permission confirmed by the founder · Written terms pending

Iman confirms that she has the Church’s permission to use the land for the project. The legal recipient, duration, permitted activities and construction rights still need written confirmation. The intended equipment-ownership arrangement is described below; the Church remains the identified landowner.

Project coordination and local management
Named coordination contacts

Founder Iman Tadros coordinates development-partner enquiries and machinery-donation paperwork. She identifies Bishop Sarabon and farm manager Jhone Wadeea as the local contacts in Sudan. Equipment ownership, custody, technical operation and maintenance responsibilities will be documented with the Church and prospective partners before delivery.

Latest site visit
Approximately mid-October 2026

The founder reports a visit around mid-October 2026. Its exact date and record remain unconfirmed; it has not been established as a technical assessment.

Technical assessment
Dated report still needed

The recent visit has not been confirmed as a technical assessment. A dated assessment of the wells, water-storage needs and rebuilding requirements is still needed before specifications and delivery plans can be finalised.

Current access
Local verification required

Safe access, local permissions and delivery routes must be checked before each visit or shipment. A past visit does not establish that future access is safe.

Water availability
Wells reported intact · Pumps broken · Reservoir proposed

The founder’s latest update from Sudan reports seven intact wells with broken pumps requiring replacement. It supersedes the earlier account of destroyed wells and stolen pumps. A qualified assessment must inspect the wells and measure sustainable flow, operating water levels and water quality before pumps, power and reservoir storage are specified.

Secure equipment storage
Availability not confirmed

Secure storage and custody arrangements must be assessed and established before equipment is delivered. Detailed security information and exact storage locations will not be published.

Sensitive supporting documents are not hosted on this public website. Prospective partners can discuss document availability and a suitable private review process with Iman. Some records and agreements still need to be obtained or completed.

What support could provide

Specific needs.
One working system.

These six equipment categories support the proposed first water and training system. Specifications and prices will follow assessment; no quotation-backed funding total is available.

View the wider Phase 1 equipment concept

The Phase 1 production concept, in pictures

The tools to start growing.

The illustration explores a possible 20–30 hectare production block, beyond the immediate water-restoration stage. The assessed first growing area may be smaller. Equipment categories shown need technical review before procurement.

Virgin Mary Farm Phase 1 planning illustration with the original Risemeup logo, eight proposed equipment categories and nine planned support activities, including technical design, crop planning, equipment sourcing, irrigation, land preparation, supplier coordination, training, monitoring and expansion planning. No estimated prices are shown.
Planning illustration · Proposed equipment and support activities, not existing assets or confirmed purchases.
Open the equipment picture at full size ↗

Assessment before procurement. Equipment must suit the assessed water supply, growing area, operators and maintenance arrangements.

Replacement well pumps and controls

1 initial water-source system, subject to technical assessment

Awaiting quotation

Replace broken pumps in the existing wells, following inspection, to restore supply for an initial growing and training area.

Required specification, operation and cost
Specification to confirm
Inspect the wells reported intact and test sustainable yield and water quality. Select replacement pump type, flow, total dynamic head and power using measured operating water levels and delivery requirements. Include rising main, cables, protection, fittings and a water meter; sizes to be confirmed.
Operator & maintenance
Proposed: a qualified well and pump contractor for inspection, installation and commissioning, then a trained pump operator with supplier servicing. Farm manager Jhone Wadeea is the local management contact; technical operators and maintenance providers remain to be confirmed.
Estimated cost
Awaiting assessment and supplier quotation. No amount established.

Solar power and pump controls

1 matched power package for the initial pump

Awaiting quotation

Provide power for the restored water-pumping system, subject to technical suitability.

Required specification, operation and cost
Specification to confirm
Panel capacity and controller matched to the selected pump and site conditions; secure mounting, cabling, earthing and electrical protection. No power rating specified before design.
Operator & maintenance
Proposed: the trained pump operator for routine checks and a qualified solar technician for servicing. Appointments and service arrangements pending.
Estimated cost
Awaiting assessment and supplier quotation. No amount established.

Reservoir or tank storage and filtration

1 integrated system; tank count and capacity to be determined

Awaiting quotation

Design new reservoir or tank storage for irrigation, with filtration to protect the distribution system.

Required specification, operation and cost
Specification to confirm
New storage is proposed. Reservoir lining, protection, usable capacity and any cover, or tank numbers and supports, must follow site assessment, water testing and demand calculations. Filters, valves and pipe sizes also need design. Irrigation use; drinking-water suitability is not established.
Operator & maintenance
Proposed: a trained irrigation caretaker with supplier support and a cleaning schedule. Named responsibility and maintenance budget pending.
Estimated cost
Awaiting assessment and supplier quotation. No amount established.

Pilot-area irrigation network

1 initial growing area; hectares and network length to be confirmed

Awaiting quotation

Deliver measured water to crops and support practical irrigation training.

Required specification, operation and cost
Specification to confirm
Mainlines, distribution pipes, valves and drip equipment sized to the assessed water supply, crop plan and soil. Include fittings, meters and essential spares.
Operator & maintenance
Proposed: a local growing team and irrigation caretaker, supported by an agronomist. Names and servicing arrangements pending.
Estimated cost
Awaiting assessment and supplier quotation. No amount established.

Growing and training tools

1 starter package; individual tool quantities depend on the training plan

Awaiting quotation

Enable initial cultivation and supervised sustainable farming education.

Required specification, operation and cost
Specification to confirm
Hand tools, appropriate protective equipment, basic soil and irrigation monitoring tools and teaching materials. Inventory to be agreed with the local trainer and community representatives.
Operator & maintenance
Proposed: a designated trainer and tool custodian, using a sign-out and maintenance register. Appointments pending.
Estimated cost
Awaiting training plan and supplier quotation. No amount established.

Secure storage and equipment protection

1 site protection package; scope to follow the access and security assessment

Awaiting quotation

Protect replacement equipment and provide accountable storage for tools and spares.

Required specification, operation and cost
Specification to confirm
Assess lockable storage, secure installations, asset identification and practical local custody arrangements. Detailed locations and security measures to remain private.
Operator & maintenance
Proposed: a Church-agreed site custodian under an approved asset-management arrangement. Custodian and upkeep responsibility pending.
Estimated cost
Awaiting site assessment and supplier quotation. No amount established.

Before donating machinery: please agree the specification with us. Compatibility, delivery, installation, local spare parts, servicing and operator training must be included. The tractor and land-preparation implements will be specified once the initial cultivation area is defined.

Funding transparency

A budget built
on evidence.

Budget statusAssessment comes first.

No quotation-backed funding total has been set.

We need technical partners to assess the site and develop an itemised first-stage budget.

The budget will cover well inspection, replacement pumps, reservoir or tank storage, power, filtration, irrigation, installation, training, maintenance and contingency, including agreed in-kind support.

Once costs are validated, we plan to publish a dated budget summary and report how agreed support is used.

Help assess and cost the first stage →

Community benefit and accountability

Built with people.
Accountable to them.

The approach below is proposed for agreement with the Church, community representatives and development partners before implementation. These arrangements are not yet adopted operating policies.

Organisation status

Risemeup is a London-based initiative and is not currently registered in the UK. Before accepting project funding or equipment, the legal structure and eligible recipient must be agreed.

Participation

Fair access to opportunity

Proposed selection would consider household need, displacement, barriers to livelihoods and interest in farming or training. Criteria should be transparent, with a way to raise concerns. Participation should not depend on religious observance.

Community voice

Shape the project together

All three communities would help shape training, schedules and access, with women a priority. Consultation should address the needs of young people and displaced families, including travel, caring responsibilities and accessibility.

Equipment and income

Protect the community purpose

Founder Iman Tadros confirms the intended arrangement: donated machinery and project equipment will belong to Virgin Mary Farm together with Risemeup, for the farm’s community purpose. This does not change ownership of the land.

The legal recipient and title, donor conditions, asset custody, maintenance and transfer or disposal rules will be recorded in written agreements with the Church and donors before equipment is accepted or delivered. The proposed income model would support operations, maintenance, education and community benefit; allocations and reporting need governance approval.

Financial controls

Make support traceable

Proposed controls include a separate project ledger, documented purchasing and approvals, retained receipts, an asset register and regular expenditure and progress reports. Named oversight and reporting responsibilities must be agreed before funds are received.

Safeguarding, complaints and financial policies

Adopted policy documents and responsible officers have not yet been published. Safeguarding, safe recruitment and conduct, confidential complaints, conflicts of interest and financial controls need to be agreed and put into use before activities begin. Approved versions and accessible reporting routes will then be published.

Iman can receive general questions about the proposed arrangements. A formal safeguarding or independent complaints route has not yet been confirmed for publication; please do not send sensitive case details through a general enquiry.

Reference for developing these arrangements: Misereor’s policies, guides and forms. This is a guidance reference, not a claim of partnership or endorsement.

Our planned contribution to the SDGs

Shared goals.
Measurable local progress.

Baseline measurements, realistic targets and reporting responsibilities will be agreed during assessment. The measures below describe what we propose to track; they are not achieved results.

Goal 7Affordable and clean energy

Power for water

Proposed measure: renewable electricity generated in kWh and the share of pumping energy supplied by solar.

First-stage target: to be set after system design.
Goal 9Industry, innovation and infrastructure

A working first system

Proposed measure: wells commissioned, cubic metres of water delivered and hectares irrigated.

Proposed initial output: an operational pumping and storage system following well inspection and pump replacement, subject to assessment; area and flow targets pending.
Goal 10Reduced inequalities

Skills and participation

Proposed measure: training enrolment, completion and access to livelihood opportunities, with voluntary, appropriate records of participation across the communities.

Targets for women, young people and displaced families to be agreed through consultation.
Goal 12Responsible consumption and production

Use resources well

Proposed measure: kilograms of organic material reused and produce losses. Wider biogas and fertiliser measures apply only when those facilities operate.

Baseline and targets to be agreed for the first growing cycle.

SDG alignment is Risemeup’s own planning framework. It is not United Nations approval, certification or endorsement. These are proposed project measures, not official UN indicators.

See our four SDG commitments →

The story and its records

Personal commitment.
Honest evidence.

Our founder’s account and photographs document the story of food support in London during coronavirus and assistance for families in Sudan. Exact photograph dates and distribution totals have not yet been verified for publication.

Organisation names, independent references and documented results will be added only when records and permission to publish are available. No third-party endorsement is implied by the archive.

View the photographs and record notes →

Start with a defined contribution

Bring your expertise.
Build with us.

Can you help assess the wells, design irrigation or cost the first water system? Contact Iman with your organisation, expertise and the contribution you would like to discuss.

Download the two-page brief ↓
Your named contact

Iman Tadros

Founder, Risemeup
London · Sudan

i.tadros@risemeup.org+44 786 797 7844

Please include your organisation and the component you would like to discuss. We will agree a suitable private channel before exchanging sensitive supporting documents.